What a difference a year makes in San Joaquin Restoration vision

May 9, 2007 10:32 AM, By Harry Cline
Farm Press Editorial Staff


The latest federal government cost estimate to put salmon back into the San Joaquin River is $500 million. Add in state costs and estimates put the price tag as high as $1.2 billion.

Not surprising, Congressman Devin Nunes of Visalia says proponents of the river “restoration” will have a hard time getting the cash from the feds. Those who support bringing fish back to the river say the latest cost figure is not unexpected, and they can handle it.

This river restoration deal was announced last year with the backdrop of water cascading over the spillway at Friant Dam. Today you can almost skip a rock across Millerton Lake. Last year water officials were worried about downstream flooding and bridges washing out. This year they are wondering if California is on the brink of a global-warming drought.

To think about spending $1.2 billion to restore salmon to the San Joaquin River in 2007 borders on absurd. Last year it was a wonderful idea. If the river restoration plan was in place today, Millerton could basically be drained dry for the benefit of fish.

The river restoration pact calls for the release of from 247,000 to 555,000 acre feet of water annually from Friant Dam/Millerton Lake to maintain a constant river flow to the San Francisco Bay so fish can swim in it. Farmers are entitled to about 117,000 acres feet annually from Millerton.

There are only 287,000 acre feet of water behind Friant Dam now. Millerton is half full. This is an oversimplification. Water management is much more complicated than that. However, numbers can be telling when you are talking about basically taking as much as a full reservoir of water to support fish.

Last year water was flowing over the spillway. Granted, the ’07 snow melt is far from finished. However, the snow pack is only about 50 percent of normal. It ranks among the bottom 25 percent since surveys began in 1930. It is highly unlikely Millerton will fill this year.

Farmers are already out buying water from Northern California and elsewhere. They are constantly calculating how much surface water they will receive and the cost of pumping from wells. Many San Joaquin Valley producers are calculating how much water their trees and vines will need and what will be left over for row crops. Permanent crops cannot be short-watered. Trees and vines will die without water.

In the midst of all this, Congress is being asked to shell out $500 million to restore sport fishing to the San Joaquin River.

I have no idea if a deal has been cut with environmentalists to support Temperance Flat or other dams in return for farmer support to San Joaquin River restoration. If it was, I’d make sure I to get it in writing.

The river restoration will happen. However, it will be another patchwork “solution” to a problem California leaders refuse to realistically face.

If and when the day comes when California must fund the construction of Temperance Flat at a price tag of $1.2 billion, we can all look wistfully at the $1.2 billion salmon swimming in the San Joaquin River.

email: hcline@farmpress.com

Get Copyright ClearanceWant to use this article? Click here for options!
© 2008 Penton Media, Inc.


Latest Jobs

resources

events icon events

product info icon tradeshows

tradeshow icon digests

research icon photos

Continuing Education

ACCREDITED IN CALIFORNIA ONLY:


Almond Pest Management

Get the latest info on almond insect pest management and earn 2 hrs. CE DPR and CCA credit in California.

California Groundwater Protection Regulations

Earn 2 hrs. in California laws and regs CE and learn how to protect California groundwater supplies.

(New Course)
Disease Management in California Almonds

Managing diseases in California almond production is a year-long process. This course provides the latest information on controlling these diseases with management practices and fungicides. The course is approved for 2 CEUs by DPR for PCAs and all applicator categories and California CCAs.

Powdery Mildew Control in California Grapevines

Learn about the No. 1 grape disease in California; earn 2 California CE hours.

ACCREDITED IN CALIFORNIA AND ARIZONA:


Insecticide Resistance Management in Agronomic and Row Crops

A 3-hr. CE approved for California and Arizona licensees and CCAs in both states.

Agronomic Weed Resistance Management in Row Crops, Trees Nuts and Vines

Weeds Resistance Management is approved for 3 hours of CE credit for all California and Arizona licensees and Certified Crop Advisers.

Lepidopterous Pest Management/ Pesticide Safety

This course is approved for 2 hours in Arizona and California (1 hr. of laws/regs; 1 hour Other) and for CCAs.

Managing Spray Drift to Minimize Problems

2-hrs laws and regs for California licensees; 2 hours in Arizona and for CCAs.

(New Course)
The Role of Copper in Disease Control

Copper has long been a key tool in disease control in a many crops. This 2-CEU course accredited California PCAs and all DPR applicator categories and Arizona applicators details how best to use copper to maximize its potential.

Back to Top

Browse Print Issues

Additional Resources

subscribe to Farm Press Daily Southeast Farm Press Southwest Farm Press Delta Farm Press